You finish a job in a customer's house, pack the van and then wonder: should that have been notified? It is a common worry, and the answer matters. If notifiable work isn't notified, the house has no record that it complies with the Building Regulations. That can cause trouble when the customer sells. This post covers dwellings in England. Wales has its own version of the rules.
The short answer
Part P is the part of the Building Regulations that deals with electrical safety in homes. The statutory guidance is Approved Document P (the 2013 edition, in force from 6 April 2013, and the only edition GOV.UK currently lists). The 2013 edition cut the range of work that has to be notified.
The guidance sorts work by what it is, such as a new circuit or a consumer unit replacement. So don't assume a small or occasional job is exempt. Check the job against the list below, whatever the size.
Work that must be notified
The notifiable work is set out in regulation 12(6A) of the Building Regulations 2010. A person intending to carry out the work must give a building notice, or an application for building control approval with full plans, for:
the installation of a new circuit;
the replacement of a consumer unit (the fuse board); and
additions and alterations to existing circuits in a special location, such as the area around a bath or shower, as described in paragraph 2.6 of Approved Document P.
Bathrooms and shower rooms
Paragraph 2.6 of Approved Document P says minor additions and alterations to existing circuits, and new circuits, are notifiable in the space around a bath tub or shower tray. Diagram 2 shows that space as 600mm either side of the bath or shower tray, up to a height of 2.25m. A note on the diagram says socket-outlets should not be within 3m of the bath or shower tray.
So adding a spur or moving a light in that zone is notifiable, even though the same change in a bedroom would not be.
Work that does not need notifying
Paragraph 2.7 of the Approved Document says all other electrical installation work is not notifiable. That means:
additions and alterations to existing circuits outside special locations; and
replacements, repairs and maintenance anywhere in the home.
Fixed equipment needs a little care. Paragraph 2.8 says installing fixed electrical equipment is within the scope of Part P, even if the final connection is a 13A plug and socket. It is notifiable only if it involves work listed in regulation 12(6A). The guidance gives two examples:
Installing a built-in cooker is not notifiable, unless a new cooker circuit is needed.
Connecting an electric gate or garage door to an existing isolator is not notifiable, but a new circuit from the consumer unit to the isolator is.
If you are only swapping a socket or a light fitting, see our post on whether you need a certificate after replacing one socket or a light fitting.
Not notifiable does not mean not regulated
This catches people out. All electrical installation work in a dwelling is subject to requirement P1 and should meet the design and installation guidance, whether or not it is notifiable (paragraph 2.1). Paragraph 3.13 says non-notifiable work should still be designed, installed, inspected, tested and certificated to BS 7671, the wiring regulations.
Paragraph 3.14 adds that if a local authority finds non-notifiable work unsafe and non-compliant, it can take enforcement action. Skipping notification is one thing. Skipping the standard is another.
Three ways to get notifiable work certified
Paragraph 3.1 of the Approved Document says notifiable work must go through one of three routes:
Self-certification by a registered competent person. You are registered with a Part P competent person self-certification scheme.
Certification by a registered third-party certifier. You appoint them before the work starts.
Certification by a building control body. You notify them before work begins.
If you are a registered competent person
You or your registration body must give the occupier a copy of the Building Regulations compliance certificate within 30 days of completion. The certificate, or the information on it, must also go to the building control body (paragraph 3.4). GOV.UK has an overview of competent person schemes.
If you are not registered
You have two options. You can appoint a registered third-party certifier before work starts. Or you can notify a building control body before work begins (paragraph 3.8). The building control body decides how much inspection and testing it needs. If you are competent to inspect and test, you should give it the BS 7671 certificate (paragraph 3.10). Both routes depend on acting before the work starts, so a one-off job needs the decision made at the quote stage, not after.
What if the job has already been done without notification?
If you realise afterwards that a job was notifiable and nothing was done, contact the local authority building control for the area. Explain what you did and ask what they need from you. Don't guess at a fix, and don't tell the customer it will be sorted until you know.
The reason to act is practical. GOV.UK's guide to building work, replacements and repairs says that if work was not notified, or not done by a competent person scheme installer, the local authority has no record that it complies. Buyers may ask for compliance certificates when the house is sold.
The responsibility is not only yours. The Approved Document says the agent, designer, builder or installer must ensure the work complies, and the building owner may also be responsible. If work doesn't comply, the owner may be served with an enforcement notice. Your customer has a stake in this, and you will want to be clear with them early.
Check the certificate arrives
The same GOV.UK guide says that if you use a competent person scheme installer, the customer should get a compliance certificate. If it hasn't arrived within 30 days of completion, they should contact the scheme operator. If you are the installer, don't wait for that call. Note the 30-day date on the job.
If you use Quidjob to run your jobs, you can keep the certificate details, the completion date and the 30-day deadline with the job record and the customer's invoice. It is a place to keep the paperwork together, not a replacement for the notification itself.
A simple check before every job
Is it a dwelling in England?
Is there a new circuit, a consumer unit replacement, or work to a circuit in a bath or shower zone?
If yes, which route are you using: registered scheme, third-party certifier or building control?
If you are not registered, have you notified or appointed before starting?
Will you inspect, test and certificate the work to BS 7671 whether or not it is notifiable?
This is general information, not legal advice. If a job doesn't fit neatly, ask your scheme provider or the local authority building control. The rules can also be reviewed, so check the Approved Document P page on GOV.UK for the current edition. For the difference between the certificates themselves, see our guide to EIC vs EICR.
Wrapping up
A one-off job gets no special treatment. New circuits, consumer unit replacements and work to circuits in bath and shower zones must be notified. Other work doesn't need notifying, but it still has to meet the standard and be certificated. Decide the route before you start. If something slips, contact building control rather than hoping nobody asks.
