Customers, landlords and solicitors often ask for “the electrical certificate” as if there were only one. There are three you’ll use most: the Electrical Installation Certificate (EIC), the Minor Electrical Installation Works Certificate (Minor Works) and the Electrical Installation Condition Report (EICR). This guide covers when each is used, who signs, the EICR codes under BS 7671:2018+A4:2026, and how Part P notification fits in. It’s written for England, with a note on Scotland.
The three certificates side by side
| EIC | Minor Works certificate | EICR | |
|---|---|---|---|
| What it’s for | New installation, new circuits, or a consumer unit replacement | A small alteration or addition with no new circuit | The condition of an existing installation |
| Who signs | Designer, constructor and inspector (one person can sign all three) | The person who did the work | The inspector |
| What it says | The work was safe to use when put into service | The minor work was done and tested | Satisfactory or unsatisfactory, with coded observations |
| Part P notifiable? | Often, for new circuits and consumer units | Only for work in a bathroom’s special location | No, it records an inspection, not new work |
The Electrical Installation Certificate (EIC)
The IET’s Amendment 4 model EIC is used for:
- the first certification of a new installation
- an addition or alteration that introduces one or more new circuits
- the replacement of a consumer unit or distribution board
- several additions, alterations or remedial works together, as an alternative to a stack of Minor Works certificates
It isn’t for periodic inspection. The form has three declarations: design, construction, and inspection and testing. If one person does all three, one signature covers them. The certificate is only valid with the schedule of inspections completed and the schedules of circuit details and test results attached.
The Minor Works certificate
The Amendment 4 form says it’s to be used only for minor work that doesn’t include a new circuit. An extra socket on an existing circuit is the classic example. If the job grows to include a new circuit, it needs an EIC instead. Amendment 4 also renamed the end-to-end resistance readings on the form to r1-r1, rn-rn and r2-r2, so check you’re filling in the new boxes.
The Electrical Installation Condition Report (EICR)
An EICR doesn’t certify any work. It reports on the condition of an installation that’s already in use: a landlord’s 5-yearly inspection, a house sale, or a homeowner who wants to know where they stand.
The codes
Each observation gets one of four codes on the Amendment 4 form:
- C1: danger present, risk of injury, immediate remedial action needed
- C2: potentially dangerous, urgent remedial action needed
- C3: improvement recommended
- FI: further investigation is advised
Satisfactory or unsatisfactory
Under BS 7671:2018+A4:2026, the overall assessment is unsatisfactory only when there’s a C1 or a C2. The IET form says C3 and FI observations are advisory and don’t affect the overall assessment.
That’s a change. Under the older Amendment 2 and Amendment 3 forms, an FI did make the report unsatisfactory. NICEIC calls it one of the biggest changes for EICRs. Expect landlords to ask why a report with an FI now passes; explain what the FI is and what you’d need to investigate it. England’s rented-sector regulations still refer to further investigation, and a proposed amendment would change that; our landlord gas safety and EICR guide covers where that stands.
Amendment 4 and the IET’s free forms
BS 7671:2018+A4:2026 was published on 15 April 2026. According to NICEIC, the previous version, BS 7671:2018+A2:2022+A3:2024 with its 2023 corrigendum, was withdrawn on 15 October 2026, so Amendment 4 is now the only current edition. The IET confirms Amendment 4 is available.
The IET publishes free model forms for Amendment 4: the EIC, the Minor Works certificate, the EICR and a supplementary bonding schedule. Under the IET’s terms you can use them free in your electrical contracting business, but not resell them or use the IET logo, and the permission lapses after 7 years.
Part P notification and the compliance certificate
In England, regulation 12 of the Building Regulations 2010 makes some electrical work in homes notifiable: a new circuit, a consumer unit replacement, and additions or alterations in a bathroom’s special location. Approved Document P, the 2013 edition, is still the current guidance.
Registered with a competent person scheme, you self-certify. Under regulation 20, not more than 30 days after the work is finished, the building control authority is given a notice or certificate and the occupier gets a copy of the certificate. That compliance certificate is separate from your EIC. If you’re not registered, the customer has to go through building control before the work starts.
How often an installation should be inspected
Outside rented homes, inspection intervals are recommendations, not law. The IET’s Wiring Matters explains that the intervals in Guidance Note 3 are recommended initial frequencies. For rented homes and HMOs, the recommended maximum is five years or a change of occupancy. For owner-occupied homes, 10 years is a common recommendation, NICEIC’s for one. Whatever the starting point, you set the date of the next inspection on each report based on what you find.
For rented homes in England, the 5 years is law: the 2020 regulations require an inspection and test at least every 5 years and before a new tenancy.
Can an EIC count for a rental?
In Scotland, yes: the Repairing Standard guidance accepts an EIC issued no more than five years ago in place of an EICR. In England, the regulations ask for an inspection and test and a report on it, and we haven’t found anything official saying an EIC counts instead. Check the gov.uk guidance before telling a landlord that a recent EIC covers them.
Pricing the paperwork
Testing and certification take time, so show them on the quote. A separate line for testing, the certificate and Part P notification tells the customer it’s part of the job, not an extra. Our free electrical quote template has a line for it, and our page for electricians lists the certificates customers ask for.
In Quidjob you can issue EICs, EICRs and Minor Works certificates, with reminders when an inspection is due again. Try Pro free for 14 days, with no card.
Official sources
- IET: BS 7671 model forms
- IET: Amendment 4:2026 to BS 7671:2018
- NICEIC: Amendment 4
- Building Regulations 2010, regulation 12 (notifiable electrical work)
- Building Regulations 2010, regulation 20 (self-certification schemes)
- GOV.UK: Electrical safety, Approved Document P
- IET Wiring Matters: EICR myths
- NICEIC: Electrical installation condition reports
- Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, regulation 3
- Scottish Government: Repairing Standard statutory guidance for landlords, electrical safety
Last checked 17 October 2026 against electrical.theiet.org, niceic.com, legislation.gov.uk, GOV.UK, gov.scot. General guidance for UK businesses, not legal, tax or financial advice. For your own situation, ask HMRC, an accountant or a solicitor.