Choose which optional cookies we may use. You can change this any time from “Cookie settings” at the foot of every page. Cookie policy

For builders

Quote the knock-through before the dust settles.

Price labour, materials and skips from your price book, send the quote on WhatsApp, take the deposit by bank transfer and let the balance chase itself.

14 days free. No card needed. Works in any browser, on your phone or computer.

Demo: an invoice from a plumber lands in the customer's inbox with the bank details on it. The customer pays from their banking app and taps I've sent it, the plumber confirms it landed, chasing stops and a receipt goes.

The certificates builders need

Building work runs on approvals and notices more than personal licences. These are the certificates and duties customers, solicitors and main contractors ask about.

  • Required by law for some work

    Building regulations approval and completion certificate

    Structural alterations and extensions need approval from building control: the council or a registered building control approver, by full plans or a building notice. When the work passes, the customer gets a completion certificate (a final certificate from an approver), which they'll need when they sell.

    Source: GOV.UK: building regulations approval

  • Required by law for some work

    Party wall notices

    Under the Party Wall etc. Act 1996, work to a shared wall, a new wall on the boundary or digging foundations near a neighbour's needs notice to the neighbour first: at least two months for party wall work and one month for the others.

    Source: GOV.UK: party walls and building work

  • Required by law for some work

    CDM 2015 duties for domestic jobs

    On a homeowner's job the client duties pass to you: to the contractor on a single-contractor job, or to the principal contractor when there's more than one. That means planning, managing and monitoring the work so it's done safely.

    Source: HSE: CDM 2015 and domestic clients

  • Voluntary, often asked for

    CSCS card

    Not a legal requirement, but most principal contractors and major housebuilders ask for one on site. It shows you hold the training and qualifications for your job, and usually needs a health and safety test plus a recognised trade qualification.

    Source: CSCS: about the scheme

  • Voluntary, often asked for

    TrustMark registration

    The Government Endorsed Quality Scheme for work in and around the home. Registration is voluntary and vetted, and some grant-funded work asks for it.

    Source: TrustMark: about us

  • Required by law for some work

    Asbestos awareness training

    Employers must train anyone liable to disturb asbestos, and HSE names this trade among them. Older homes can hide it in textured coatings, boards, flues and roof sheets, so the training helps you spot it and stop before you drill, sand or cut.

    Source: Control of Asbestos Regulations 2012, reg 10, and HSE guidance

Checked against the official sources on 14 October 2026. A plain-English summary for England unless it says otherwise, not legal advice: rules differ in Scotland, Wales and Northern Ireland.

A builder's quote, ready to send

Lines from your price book, VAT worked out to the penny, a deposit to accept and the balance on completion. Your customer opens it from a link, accepts and pays the deposit by bank transfer.

Example prices, before VAT. Set your own in your price book.

Quote Q-5208

Sample

From
Your builder business
Prepared for
Your customer
Valid for
30 days

The job

Remove load-bearing wall and fit steel beam

Total

£3,318.00

Priced lines for Remove load-bearing wall and fit steel beam
DescriptionQty × priceVATAmount
Structural engineer's calculations (provisional sum)1 each × £450.00, VAT 20%1 each × £450.0020%£450.00
Steel beam, 203 × 133 UB, 3.6 m, delivered1 each × £390.00, VAT 20%1 each × £390.0020%£390.00
Padstones, prop hire and sundries1 lot × £185.00, VAT 20%1 lot × £185.0020%£185.00
Two-person team: remove wall and install beam2 days × £520.00, VAT 20%2 days × £520.0020%£1,040.00
Board and skim the beam and reveals1 job × £380.00, VAT 20%1 job × £380.0020%£380.00
Skip hire, 6 yard1 each × £320.00, VAT 20%1 each × £320.0020%£320.00

Notes

Building control fee paid by you directly to building control. Party wall notices, if the wall is shared, are not included. Decorating not included.

Subtotal
£2,765.00
VAT
£553.00
Total
£3,318.00
Deposit to accept (20%)
£663.60
Balance on completion
£2,654.40

A builder's price book, ready to import

13 common jobs and materials with example prices. Download the CSV, change the prices to yours, and import it in Quidjob under Settings, Price book. Every quote after that starts from your own prices.

Price book for builders, example prices before VAT
ItemCategoryUnitPrice ex VAT
Labourer, day rateLabourday£160.00
Bricklayer, day rateLabourday£240.00
Two-person team, day rateLabourday£520.00
Blockwork, 100mm, laidMasonrym²£85.00
Facing brickwork, laidMasonrym²£120.00
Repoint brickworkMasonrym²£45.00
Dig and pour strip foundationGroundworksmetre£180.00
Mini digger with driverPlantday£350.00
Skip hire, 6 yardWasteeach£320.00
Skip hire, 8 yardWasteeach£370.00
Ready-mix concrete, C25Materialsm³£150.00
Steel beam, 203 × 133 UBMaterialsmetre£105.00
Concrete blocks, 100mmMaterialseach£2.20

Example prices only, not a survey of what builders charge. Your area, overheads and experience set yours.

Wanted: Beta testers wanted

Are you a builder? Help shape Quidjob.

We're looking for builders to use Quidjob on real jobs and tell us what's missing or what gets in the way. You get a direct line to the people building it.

Free tools for builders

Templates, calculators and plain-English guides. No sign-up needed. See them all.

Questions builders ask

Anything else? Email hello@quidjob.co.uk.

Who gets building regulations approval, me or the customer?

The person having the work done is responsible, but builders often apply on their behalf. Agree in the quote who deals with building control and who pays the fee, and make sure the customer gets the completion certificate at the end.

When do I need party wall notices?

For work on a shared wall, a new wall on the boundary, or digging foundations within 3 metres (sometimes 6) of a neighbour's building. Notice goes to the neighbour at least one or two months before work starts, depending on the work.

Do I need to follow CDM on a small domestic job?

Yes. On a homeowner's job the client duties pass to you as the contractor, or to the principal contractor if there's more than one. For most small jobs that's a short written plan and running the site safely.

How should I set staged payments on a building quote?

Split the job into stages a customer can see, such as groundworks, shell and finish, with a payment for each. A modest deposit for materials plus stage payments keeps you funded, and Citizens Advice tells customers that paying in stages is a good idea.

Does the VAT reverse charge apply to my invoices?

Only when you're working for another VAT-registered business under CIS that isn't the end user. Work for homeowners is always normal VAT. Our reverse charge guide has a quick “does it apply?” check.

How do I use the price book in Quidjob?

Download the CSV, change the prices to your own, then in Quidjob open Settings, Price book and import the file. Quidjob reads the Name, Price and Unit columns.

Send the invoice. Get paid by bank.

Quotes, invoices and bank transfers for UK trades. 14 days free, no card needed.

Start free