The certificates heating engineers need
Which registrations you need depends on the fuel: gas, oil, solid fuel or heat pumps each have their own scheme. These are the ones customers, landlords and grant schemes ask about.
Required by law for some work
Gas Safe registration
Required by law for any work on gas boilers, appliances or pipework. Your ID card lists the licence categories you can work on, and customers can check you on the Gas Safe Register.
Source: Gas Safety (Installation and Use) Regulations 1998, reg 3
Voluntary, often asked for
OFTEC registration (oil)
OFTEC is the main competent person scheme for oil-fired boilers and tanks. Registered technicians self-certify installations, complete a CD/10 completion report and notify building control through OFTEC.
Source: GOV.UK: competent person schemes
Voluntary, often asked for
HETAS registration (solid fuel and biomass)
HETAS registers installers of wood burners, multi-fuel stoves and biomass boilers. Installers notify HETAS within 14 days of finishing, and the customer gets a certificate of Building Regulations compliance.
Source: HETAS: notifications
Voluntary, often asked for
MCS certification (heat pumps)
Only MCS-certified installers can apply for Boiler Upgrade Scheme grants, currently £7,500 towards an air or ground source heat pump in England and Wales. Without MCS, your customer can't get the grant.
Source: Ofgem: Boiler Upgrade Scheme
Voluntary, often asked for
Benchmark commissioning checklist
Filling in the Benchmark checklist is an accepted way to show a new boiler or cylinder was commissioned to Part L. It isn't a law in itself, but manufacturers usually need it for the warranty.
Source: Benchmark scheme
Required by law for some work
Unvented hot water competence (G3)
Unvented cylinders must meet Part G3's safety rules. Approved Document G expects a competent installer, shown by scheme registration or a current unvented skills card; otherwise building control must be told first.
Source: Building Regulations 2010, Schedule 1, Part G3
Required by law for some work
Building Regulations compliance certificate
Installing or replacing a heating system or boiler is notifiable building work. Registered with a competent person scheme (Gas Safe, OFTEC, HETAS, APHC and others), you self-certify it: within 30 days of finishing, the customer gets a certificate and building control is told. Without a scheme, the customer has to go through building control before the work starts.
Source: Building Regulations 2010, reg 20