Choose which optional cookies we may use. You can change this any time from “Cookie settings” at the foot of every page. Cookie policy

For electricians

Quote the board change before you've tested the last circuit.

Price the kit, the labour and the certificate from your price book, send it on WhatsApp, take a deposit and let the balance chase itself.

14 days free. No card needed. Works in any browser, on your phone or computer.

Demo: an invoice from a plumber lands in the customer's inbox with the bank details on it. The customer pays from their banking app and taps I've sent it, the plumber confirms it landed, chasing stops and a receipt goes.

The certificates electricians need

Electrical work in homes is covered by Part P of the Building Regulations in England, and every job ends with a certificate. These are the registrations and paperwork customers, landlords and solicitors ask for.

  • Required by law for some work

    Part P competent person scheme (NICEIC, NAPIT and others)

    In England, a new circuit, a consumer unit replacement and work in a bathroom's special location are notifiable. Registered with a scheme such as NICEIC (Certsure), NAPIT, BESCA, Blue Flame or OFTEC, you self-certify; otherwise the customer must go to building control first.

    Source: Building Regulations 2010, reg 12(6A)

  • Voluntary, often asked for

    BS 7671, the IET Wiring Regulations

    The standard installations are designed, tested and certified to. The current version is BS 7671:2018+A4:2026, published in April 2026, with new forms; the Amendment 3 edition was withdrawn on 15 October 2026.

    Source: IET: Amendment 4 to BS 7671

  • Required by law for some work

    Electrical Installation Certificate (EIC)

    Issued by the installer for a new installation, or an alteration or addition that includes a new circuit, confirming it was safe to use when it was put into service.

    Source: NICEIC: certificates explained

  • Required by law for some work

    Minor Electrical Installation Works Certificate

    For smaller alterations or additions that don't include a new circuit, such as an extra socket on an existing circuit.

    Source: NICEIC: certificates explained

  • Required by law for some work

    Electrical Installation Condition Report (EICR)

    An inspection of an existing installation, coded C1, C2, C3 or FI. Private landlords in England need one at least every five years and before a new tenancy, with copies to tenants within 28 days; social landlords are now covered too.

    Source: Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, reg 3

  • Required by law for some work

    Building Regulations compliance certificate

    A new circuit or a consumer unit replacement is notifiable building work. Registered with a competent person scheme (NICEIC, NAPIT and others), you self-certify it: within 30 days of finishing, the customer gets a certificate and building control is told. Without a scheme, the customer has to go through building control before the work starts.

    Source: Building Regulations 2010, reg 20

  • Required by law for some work

    Asbestos awareness training

    Employers must train anyone liable to disturb asbestos, and HSE names this trade among them. Older homes can hide it in textured coatings, boards, flues and roof sheets, so the training helps you spot it and stop before you drill, sand or cut.

    Source: Control of Asbestos Regulations 2012, reg 10, and HSE guidance

Checked against the official sources on 14 October 2026. A plain-English summary for England unless it says otherwise, not legal advice: rules differ in Scotland, Wales and Northern Ireland.

A electrician's quote, ready to send

Lines from your price book, VAT worked out to the penny, a deposit to accept and the balance on completion. Your customer opens it from a link, accepts and pays the deposit by bank transfer.

Example prices, before VAT. Set your own in your price book.

Quote Q-4120

Sample

From
Your electrician business
Prepared for
Your customer
Valid for
30 days

The job

Replace consumer unit and add two double sockets

Total

£1,398.00

Priced lines for Replace consumer unit and add two double sockets
DescriptionQty × priceVATAmount
Consumer unit, 10-way, with RCBOs and surge protection1 each × £420.00, VAT 20%1 each × £420.0020%£420.00
Remove and dispose of old consumer unit1 job × £40.00, VAT 20%1 job × £40.0020%£40.00
Main protective bonding to gas and water1 lot × £95.00, VAT 20%1 lot × £95.0020%£95.00
Double socket added to an existing circuit2 each × £85.00, VAT 20%2 each × £85.0020%£170.00
Electrician, installation and fault finding1 day × £320.00, VAT 20%1 day × £320.0020%£320.00
Testing, Electrical Installation Certificate and Part P notification1 each × £120.00, VAT 20%1 each × £120.0020%£120.00

Notes

Any faults found on existing circuits will be explained and priced before any extra work is done. Certificate to BS 7671:2018+A4:2026.

Subtotal
£1,165.00
VAT
£233.00
Total
£1,398.00
Deposit to accept (25%)
£349.50
Balance on completion
£1,048.50

A electrician's price book, ready to import

14 common jobs and materials with example prices. Download the CSV, change the prices to yours, and import it in Quidjob under Settings, Price book. Every quote after that starts from your own prices.

Price book for electricians, example prices before VAT
ItemCategoryUnitPrice ex VAT
Call-out and first hourLaboureach£80.00
Electrician, per hourLabourhour£55.00
Electrician, day rateLabourday£320.00
EICR, up to a three-bedroom houseTestingeach£180.00
Testing and Minor Works certificateTestingeach£60.00
Consumer unit replacement, labour and certificateInstallsjob£450.00
New radial circuitInstallseach£350.00
Extra double socket on an existing circuitInstallseach£85.00
Replace a light fittingInstallseach£55.00
Outside light with PIR sensorInstallseach£110.00
Mains interlinked smoke or heat alarmSafetyeach£75.00
Consumer unit, 10-way, with RCBOs and surge protectionMaterialseach£420.00
RCBO, single moduleMaterialseach£28.00
Twin and earth cable, 2.5mm²Materialsmetre£1.80

Example prices only, not a survey of what electricians charge. Your area, overheads and experience set yours.

Wanted: Beta testers wanted

Are you a electrician? Help shape Quidjob.

We're looking for electricians to use Quidjob on real jobs and tell us what's missing or what gets in the way. You get a direct line to the people building it.

Free tools for electricians

Templates, calculators and plain-English guides. No sign-up needed. See them all.

Questions electricians ask

Anything else? Email hello@quidjob.co.uk.

What electrical work is notifiable under Part P?

In England: installing a new circuit, replacing a consumer unit, or adding to or altering circuits in a bathroom's special location (near a bath or shower). Through a competent person scheme you self-certify it; otherwise the customer needs building control before you start.

Which edition of the Wiring Regulations applies now?

BS 7671:2018+A4:2026, the 18th Edition with Amendment 4, published in April 2026. The Amendment 3 edition was withdrawn on 15 October 2026, so certificates should now be on the new forms.

How often do landlords need an EICR?

Private landlords in England need an inspection at least every five years (sooner if the report says so) and before a new tenancy. Tenants get a copy within 28 days, and the council within 7 days if it asks. The rules now cover social housing too.

Should testing and the certificate be a separate line on my quote?

It helps. A line for testing, the certificate and Part P notification shows the customer it's part of the job and not an extra, and it's easy to keep in your price book.

How much deposit should an electrician take?

There's no legal amount. Many electricians ask for enough to cover the consumer unit, cable or fittings they order. Our deposit calculator works out the deposit and the balance, with or without VAT.

How do I use the price book in Quidjob?

Download the CSV, change the prices to your own, then in Quidjob open Settings, Price book and import the file. Quidjob reads the Name, Price and Unit columns.

Send the invoice. Get paid by bank.

Quotes, invoices and bank transfers for UK trades. 14 days free, no card needed.

Start free