How long should a quote stay valid for a small trade job?

No law sets how long a quote must last, so the choice is yours. Here is how to pick a period, word it on the quote, and handle a customer who comes back after it has run out.

By Quidjob · Updated · 6 min read

An hourglass on a worktop beside fresh tiling.

A customer sits on your quote for six weeks, then says yes. In the meantime the copper, the boiler or the timber has gone up. If the quote says nothing about how long it lasts, you may be stuck with a price that no longer makes sense. A clear end date on the quote fixes most of that.

This post covers how to choose a sensible period for a small job, what to write on the quote, and what to do when the customer comes back late.

There is no official validity period

I found no UK rule that says a quote must stay valid for 14 days, 30 days or any other length. It is your decision. The 30 days you often see on quotes is a habit, not a legal standard.

What the law does cover is what happens once you have written something down. For householders (consumers), section 50 of the Consumer Rights Act 2015 treats a services contract as including what you said or wrote about the service, if the customer took it into account when deciding to go ahead. So a written price, and any wording about how long it lasts, is likely to hold you to it.

The same section says that information is subject to anything you wrote on the same occasion that qualifies it, and to any change you both expressly agree. That is why conditions such as ‘subject to material costs’ need to be on the quote itself, not in a text message afterwards.

Choosing a period that fits the job

The right length depends on how much of the price is materials, and how fast those prices move. What follows is a rule of thumb from me, not a legal rule.

  • Mostly labour (decorating a room, fitting a door, a day's plastering): 30 days is usually fine. Your costs barely change in that time.

  • Materials make up a big share (a bathroom suite, a boiler, a rewire, roofing materials): 7 to 14 days is safer, because your supplier's prices can change within weeks.

  • Specialist or ordered-in items: tie the price to the order. For example, ‘price held for 7 days; the supplier's price is confirmed when the item is ordered’.

  • Jobs the customer can't start soon: quote with a short validity and offer to re-confirm the price nearer the start date.

A worked example

Say you quote £2,400 for a bathroom refit, of which £1,300 is materials. If those materials rise by 8% before the customer says yes, that is £104 off your margin. A 30-day quote lets that happen. A 14-day quote means the customer has to decide quickly or accept a re-quote. These figures are only an illustration, but the sum is worth doing for your own jobs.

If you want a fuller way to protect your margin, see How to price a job and protect your margin when material prices rise.

What to write on the quote

Keep the wording short and put it near the price, not in small print at the bottom. A few lines do the job:

  • The date the quote was issued.

  • The date it is valid until, written as a date (for example 1 November 2026) rather than just ‘14 days’.

  • What is included, and what is not (for example, ‘price excludes any hidden pipework found once the floor is up’).

  • What happens after that date: ‘After this date I will re-check material prices and may need to reissue the quote.’

  • If material costs could change before you order, say so plainly, for example: ‘Price based on current supplier costs and held until the date above.’

Writing a date rather than a number of days stops any argument about when the clock started.

When the quote has expired and prices have moved

If the customer comes back after your date, don't assume the old price still stands, and don't assume it is dead either. Whether someone can still accept an expired quote is a point of general contract law that I haven't been able to confirm from an official source. The simplest route is to avoid the question altogether.

  1. Check today's price for the main materials.

  2. Decide whether you are happy to honour the old price. If it has barely moved, doing so can win you the job and goodwill.

  3. If not, send a fresh quote with a new date and a new validity period. Say what has changed and why, for example ‘boiler price has gone up by £X since the first quote’.

  4. Get a clear yes to the new quote, in writing, before you order materials or start work.

  5. Keep the old and new quotes together, so you can show what changed.

Putting the change in writing and getting it expressly agreed matters. Under section 50(2) of the Consumer Rights Act 2015, a change to what you told the customer needs to be expressly agreed. A customer who has simply gone quiet hasn't agreed anything.

What not to do

Don't rely on a vague ‘price may change’ line

If the quote fixes a price and the customer accepts it within the validity period, a general line saying the price may change won't let you charge more. Section 57 of the Consumer Rights Act 2015 says terms restricting your liability under sections 49 and 50 can't bind the consumer. The same goes for sections 51 and 52 where they apply. Use specific, honest conditions instead.

Don't leave the price open

If a contract doesn't fix a price or say how it will be worked out, section 51 says the customer pays a reasonable price and no more. What counts as reasonable is a question of fact. That is a weaker position than a clear written price with clear conditions.

Don't quote low and add on later

Government guidance on misleading and aggressive commercial practices gives examples where the quoted price was a third or half less than the final price, and treats that as a misleading price. A short validity period is a fair way to protect yourself. A low opening price isn't.

Don't confuse validity with the cancellation period

Your validity date is how long you hold the price. It is separate from the customer's right to cancel. For a service contract agreed away from your premises, such as at their home, the cancellation period generally ends 14 days after the contract is made (regulation 30(2) of the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013). Check the official rules before you start work inside that window, as there are exceptions and conditions.

These points apply to householders. If your customer is a business, your position can differ, so check the terms or ask an adviser.

Making it easy to reissue

A short validity period only works if re-quoting is quick. If you can update a quote and send it from your phone in a few minutes, you are far more likely to do it. Quidjob lets you quote from your phone, so you can send a fresh version with a new date while you are still on site or in the van.

Wrap-up

No rule tells you how long a quote must last, so you choose. Use a shorter period when materials are a big part of the price, write the end date on the quote, and say what happens after it. If the customer returns late, check prices and reissue the quote rather than guessing. For deposits that cover materials up front, see Deposits and stage payments: a guide for tradespeople. This is general information, not legal advice. If a dispute is brewing, check with a legal adviser or Citizens Advice.

Official sources

Last checked 22 October 2026 against legislation.gov.uk, assets.publishing.service.gov.uk. General guidance for UK businesses, not legal, tax or financial advice. For your own situation, ask HMRC, an accountant or a solicitor.

Questions

Anything else? Email hello@quidjob.co.uk.

Is there a legal minimum time a quote has to stay valid?

No. I found no UK rule that sets a minimum or standard validity period for a quote. It is your choice, but once you write it on the quote, you are likely to be held to it where the customer is a householder.

Is 30 days a sensible validity period?

It can be for jobs that are mostly labour. Where materials are a large part of the price, 7 to 14 days is safer because supplier prices can change quickly. This is a rule of thumb rather than a legal standard.

Can I charge more if material prices rise after the customer accepts?

Not simply because costs went up. If the quote fixed a price and the customer accepted it, a vague ‘price may change’ line is unlikely to help you, as terms like that can't bind a consumer under section 57 of the Consumer Rights Act 2015. Put specific conditions on the quote, or get any change expressly agreed.

What should I do if a customer accepts after my quote has expired?

Check current prices and either confirm in writing that you will honour the old price or send a new quote with a new date. Get a clear yes before ordering materials or starting work. That avoids arguments about which price applies.