Choose which optional cookies we may use. You can change this any time from “Cookie settings” at the foot of every page. Cookie policy

Quoting and pricing · 17 October 2026

What to do when a customer asks you to cut your quote mid-job

A customer wants a lower price after you have started. Learn how to answer calmly, change the scope in writing and avoid a quiet discount that eats your margin.

By Quidjob · Updated · 7 min read

Scissors cutting a timber offcut on a sawhorse.

You are halfway through a bathroom fit or a rewire when the customer says, "Could you knock a bit off? Money's tight." You want to keep them happy, you want the review, and you don't want an awkward few days on site. So you say yes. Then you do the sums at home.

A request for a lower price is not an emergency, and it is not an insult. It is the start of a conversation. This post shows you how to handle it so you keep the relationship and don't lose money without noticing.

Pause before you answer

Don't agree or refuse on the spot. A short, friendly holding line gives you time to work out what the request means for you.

"Thanks for telling me. Let me look at the numbers tonight and come back to you tomorrow morning."

Then find out what is behind it. Customers usually mean one of three things:

  • The budget has shrunk. They can't afford the whole job as quoted.

  • They think it is too dear. They may have seen a cheaper figure elsewhere or feel the price has crept up.

  • They are testing you. Some people simply ask, to see what happens.

The first one is solved by changing what you do. The second may need you to explain what the price covers. The third needs a polite, steady answer.

Why a quiet discount is the costly option

If you just take £200 off and say nothing more, three things can go wrong.

  • Your costs haven't dropped. Materials are bought, and your time is still your time. The discount comes straight out of your profit.

  • Nothing is written down. Later, you and the customer may remember the deal differently.

  • The customer learns that your price moves if they push. The next request may come before the job is finished.

If you want to look at where your margin sits before you answer, our guide on how to price a job and protect your margin is a good place to start.

Offer a change in scope, not just a lower number

The cleanest answer to "can you do it cheaper?" is "yes, if we change what I do." A lower price for a smaller job is fair to both of you. A lower price for the same job is a gift.

Ways to bring the price down without losing money

  • Take out an item, such as the tiling to the second wall or the new radiator in the spare room.

  • Let the customer supply some materials, if you are happy to fit them.

  • Swap to a cheaper product, with the customer's choice noted.

  • Split the job. Finish the essential work now and quote the rest as a separate job later.

  • Change the timing. Some customers value a fixed finish date, and some will accept a flexible one.

Give them two or three options with clear prices. People who can pick from a list feel in control, and they are less likely to simply push for a number.

Put the change in writing

For consumer customers (householders), the Consumer Rights Act 2015 treats things you said or wrote about the service as terms of the contract. That is subject to any change "expressly agreed between the consumer and the trader (before entering into the contract or later)", under section 50. In plain terms, a change to scope or price should be clearly agreed, and writing it down is the safest way to show what was agreed.

Section 50, like the rest of the Act's rules on services, only applies when a trader supplies a service to a consumer. A consumer means an individual acting for purposes wholly or mainly outside their trade, business, craft or profession, so a limited company is never one. Whether a landlord counts depends on whether they are acting wholly or mainly for business purposes, and if you say a customer isn't a consumer, it is up to you to prove it. If in doubt, get advice from a solicitor. For business customers in England, Wales and Northern Ireland, the Supply of Goods and Services Act 1982 covers the service instead, alongside your contract terms. Check whether your terms say how changes must be agreed, and get every change in writing either way.

What a short variation should say

  1. The job and the date of the original quote, so it is clear what is being changed.

  2. What is being taken out, added or swapped, in plain words.

  3. The new total price and whether VAT is included, if you are VAT-registered.

  4. Any change to the payment dates or stage payments.

  5. Any change to the finish date.

  6. The customer's reply. A signature is best, but a text or email saying "I agree" is far better than a chat on the driveway.

Keep it to a page. If you take deposits or stage payments, our guide to deposits and staged payments shows how to line the new figures up with the money you have already had.

If they want the same job for less

Sometimes there is no scope to trim. The customer wants everything you quoted, for less. You have a few reasonable replies.

  • Hold the price and explain what it includes. A short list of materials, labour and anything awkward can be enough.

  • Offer a small, specific trade, such as a modest reduction for payment in full on completion instead of in stages. Only offer what you can afford.

  • Say no politely and keep going. "I can't go lower on this one without changing the work, but I am happy to talk through options."

Be careful about threatening to stop work. Whether you can stop, and whether a price cut agreed for exactly the same work binds you, depends on your contract terms and general contract law. If the dispute is serious, get advice from a solicitor before you down tools.

If the price was never clearly fixed, there is another risk. Under section 51 of the Consumer Rights Act, if the consumer hasn't paid yet, the contract doesn't fix a price or say how it is to be worked out, and nothing you said or wrote to them that counts as part of the contract fixes it either, they only have to pay a reasonable price, and no more. The Act says what is reasonable is a question of fact, so you could end up arguing over it. That is one more reason to have a written quote and written changes.

If you are VAT-registered

A price cut can affect your VAT. Under VAT Notice 700, if you offer a customer an unconditional discount and they pay the discounted amount, the VAT is based on the discounted amount.

If you have already sent a VAT invoice and then reduce the price, Revenue and Customs Brief 6 (2019) says a credit note for a price decrease must contain:

  • an identifying number

  • the date of issue

  • your name, address and VAT registration number

  • the customer's name and address

  • the number and date of the original VAT invoice or invoices

  • a description sufficient to identify the goods or services

  • the amount of the decrease excluding VAT

The brief also says that where you and your customer are both fully taxable and agree not to adjust the VAT already accounted for, no credit note need be issued. A price decrease is not a valid reason to use the error-correction route. Your situation may differ, so check the brief or ask an accountant.

Keep your records straight

Whatever you agree, your books should show the price you actually agreed and the money you actually receive, not the original quote. HMRC says sole traders must keep records of their business income and expenses for their Self Assessment tax return. With cash basis, the default from the 2024 to 2025 tax year, you record income when you receive the money. With traditional accounting, you record it by the date you invoiced. This matters more as Making Tax Digital for Income Tax rolls out. It has applied since 6 April 2026 if your qualifying income from self-employment and property was over £50,000 in the 2024 to 2025 tax year, and you can sign up voluntarily if you aren't required yet. Our guide to Making Tax Digital for tradespeople explains what you need to keep.

Wrap-up

When a customer asks for a cut mid-job, pause, find out what is behind it and offer options that change the scope. Then put the new deal in writing, with the price and any new dates, before you carry on. A quiet discount feels friendly on the day and costs you for a long time afterwards.

If you quote and invoice from your phone, Quidjob lets you send an updated quote and a matching invoice, so the change and the final bill both sit in one place.

Official sources

Last checked 22 October 2026 against legislation.gov.uk, GOV.UK. General guidance for UK businesses, not legal, tax or financial advice. For your own situation, ask HMRC, an accountant or a solicitor.

Questions

Anything else? Email hello@quidjob.co.uk.

Can I refuse to lower my price once I have started?

Yes, you can say no and offer to change the scope instead. Whether you can stop work if the customer won't pay the agreed price depends on your contract and ordinary contract law, so get proper advice before you do.

Is a text message enough to agree a change to the price?

For consumer customers, a change should be expressly agreed, and writing it down is the safest way to show that. A clear text or email saying "I agree" to a short written summary is much better than a verbal agreement.

What if I never put the original price in writing?

Under section 51 of the Consumer Rights Act 2015, where a contract doesn't fix a price or say how it is to be fixed, the consumer must pay a reasonable price. Check the full wording on legislation.gov.uk, and write the price down from now on.

Do I need to issue a credit note if I cut the price and I am VAT-registered?

Often yes, if you have already sent a VAT invoice. HMRC says a credit note for a price decrease must include certain details, though in some cases where both parties are fully taxable and agree not to adjust the VAT, none is needed. Check the HMRC brief or ask an accountant.

Send the invoice. Get paid by bank.

Quotes, invoices and bank transfers for UK trades. 14 days free, no card needed.

Start free