Most underpricing isn’t a bad guess at the labour. It’s forgetting the hours you don’t get paid for, mixing up markup and margin, or quoting materials at last year’s prices. This guide walks through each, then the habits that keep your margin intact when prices rise.
Work out your real day rate
Your day rate has to cover three things: what you want to earn, what the business costs to run, and the days you can’t bill.
Start with costs and income
Add up a year of business costs: van, fuel, insurance, tools, phone, software, training, accountant. Then add the income you want before tax. That total is what your billable days need to bring in.
Count the days you can actually bill
There are 52 weeks in a year, but you won’t bill all of them. Take off holidays, bank holidays and some sick days. Then take off the time spent quoting, travelling, buying materials, doing paperwork and waiting between jobs. For many sole traders that unpaid time is a quarter of the working week or more.
An example
These numbers are only an illustration. Use your own.
| Example | |
|---|---|
| Business costs for the year | £9,000 |
| Income you want before tax | £36,000 |
| Total to recover | £45,000 |
| Working weeks (after holidays) | 46 |
| Working days (46 × 5) | 230 |
| Less unpaid time (25%) | 172 billable days |
| Day rate (£45,000 ÷ 172) | about £262 |
Round it to a figure you’re happy to say out loud, and review it every year.
Set aside for tax
The income figure is before tax. Put part of every payment into a separate account for Income Tax and National Insurance so the bill isn’t a shock. How much depends on your profits, so ask an accountant for a percentage that fits you.
Materials and markup
Price materials at what they’ll cost you when you buy them, then add a markup. The markup pays for the time spent choosing, ordering and collecting, for wastage and returns, and for the risk of the price moving.
List materials as a separate figure from labour on the quote, or at least know the split yourself. When prices rise, you’ll see straight away which part of the job has got more expensive.
Markup is not margin
They sound the same and they aren’t.
- Markup is profit as a percentage of what something cost you.
- Margin is profit as a percentage of the price you charge.
Worked example
You buy materials for £400 and add a 25% markup.
- Markup: £400 × 25% = £100
- Price to the customer: £500
- Margin: £100 ÷ £500 = 20%
So a 25% markup gives a 20% margin. If your accountant says you need a 20% margin and you add 20% to cost, you’ll end up with about 16.7%.
| Markup | Margin |
|---|---|
| 10% | 9.1% |
| 20% | 16.7% |
| 25% | 20% |
| 33.3% | 25% |
| 50% | 33.3% |
What’s happening to material prices
Material prices are rising faster than prices in general. The Department for Business and Trade’s building materials statistics show the price index for “All Work” up 6.4% in the year to August 2026. Repair and maintenance, the series closest to most trade work, rose 5.9%. Some items rose much more: rigid pipes and fittings were up 15.5% and fabricated structural steel 21.2%.
Over the same period, the Office for National Statistics says CPI inflation was 3.1% in the 12 months to August 2026. Materials are going up about twice as fast as consumer prices overall.
As an illustration: on a job with £5,000 of materials, a 6.4% rise is £320. If your margin on that job was £1,000, a price you set a year ago has lost almost a third of it.
How to protect your margin
Keep quote validity short
Say how long the quote stands, for example 30 days. After that, you reprice. It stops a customer accepting in March a quote you wrote in October.
Add price-variation wording for long jobs
On a job that runs for months, or that starts well after acceptance, say how material prices are handled. For example: “Materials are priced at today’s supplier prices. If the price of a named item rises before we order it, we’ll show you the new supplier price and agree the change before going ahead.” Name the items, show the supplier’s price and agree before you order. A rise is easier to accept when the customer can see where it came from.
Order materials on the deposit
Take a deposit that covers the main materials and order them as soon as it arrives. That locks in today’s price and means you aren’t funding the customer’s job. The deposits and stage payments guide covers sensible amounts, and the deposit calculator works them out.
Quote at current prices and recheck before big orders
Don’t price from memory or an old invoice. Check current prices when you quote, and check again before placing a large order. If it’s moved a lot, talk to the customer before you buy, not after.
Keep a price book and update it
Keep a list of the items you use most, with what you pay and the date you checked. Update it when a supplier invoice shows a change. Quoting gets faster and your prices stay current.
Price variations before you do them
Any extra work gets its own price, agreed in writing before you start. Unpriced extras are the most common way a profitable job ends up breaking even.
Offer options
Give the customer two or three versions of the job: good, better and best. A basic boiler swap, the same with a smart thermostat and a powerflush, and a premium boiler with a longer warranty, for example. The customer compares your options with each other rather than just with someone else’s single price, and chooses what they spend. Each option should carry its own margin.
Be clear about what’s included
For homeowners, what you say about the job counts. Under section 50 of the Consumer Rights Act 2015, information you give a consumer about the service, including the price, is treated as a term of the contract if they took it into account. A vague quote can bind you to more than you meant.
Spell out what’s in and what’s out: making good, disposal of old fittings, decoration, parking, and any item the customer is supplying. Quote templates for plumbing and building work give you a starting layout with room for inclusions and exclusions.
How Quidjob helps
Quidjob quotes list materials and labour, show the deposit and stages, and go to the customer as a link by email, or by WhatsApp or text from your own phone. They accept online and pay the deposit by bank transfer straight to your account, and variations are priced and approved before you do them. You can try Pro free for 14 days, with no card; after that the Free plan keeps 3 quotes a month.