A customer says, 'Can you put that in writing?' For a builder, that usually means a proper written quote. It is your price, your scope of work and your terms on one page. A good one wins the job. It also stops the argument six weeks later about what was and wasn't included.
This post covers what to put on a building quote, the difference between a quote and an estimate, and a template layout you can copy. It is general information, not legal advice. If a job is large or unusual, get your contract checked by someone qualified.
Quote or estimate: which one are you giving?
In everyday trade use, a quote is a fixed price for a defined piece of work. An estimate is your best guess at the cost, and the final figure may move. That is general trade practice, not a legal definition, so don't rely on the word alone to protect you.
The safest habit is to say in writing which one you mean. If it is an estimate, say what could change the price, such as hidden damp, rotten timber or a change to the plans. If it is a fixed quote, say exactly what the price covers. Whichever you pick, the detail on the page does the work.
What to put on a building quote
Your details and the customer's
Put your name or trading name, address, phone number and email at the top. Add the customer's name and the date. Give the quote a reference number so you can find it later, and so can they.
The site and the job
Write the address where the work will be done. It may differ from the customer's address. Then describe the job in plain words: what you will do, where, and to what standard. 'Build single-storey rear extension' is too loose. List the stages instead, for example:
Strip out and remove existing units and flooring
Replaster the walls in the kitchen
Fit customer-supplied units and worktops
Make good and leave the room clean and tidy
Add a start date and a rough length of time, and say that dates depend on things like weather and delivery times if that is true.
Labour and materials
Show labour and materials as separate lines. Customers find this easier to follow, and it helps you if the job changes. If you expect to buy materials at cost and pass them on, say so. If the customer is buying some items, such as tiles or a bathroom suite, say who orders, who pays and who is there for delivery.
If you work out your labour from a day rate, our guide on how to price a job shows how to protect your margin when material prices move.
What is not included
Exclusions are as important as inclusions. They cover the things you have not priced. Common ones for builders:
Skip hire and waste removal, unless you have priced them
Decorating after plastering or making good
Electrical or plumbing work done by other trades
Planning or building control fees
Hidden defects found once the work starts
Asbestos, unless the site has been surveyed
On asbestos, the Health and Safety Executive (HSE) says workers in construction and building trades are at particular risk of disturbing it. A line such as 'Asbestos not included unless surveyed' is sensible. HSE has a page on arranging an asbestos survey.
If you are quoting for a property you haven't seen, you will need to exclude more. We cover that in a separate post.
VAT: say whether prices include it
VAT is Value Added Tax. You must register for it if your taxable turnover is more than £90,000. Taxable turnover is the total value of everything you sell or supply that is not exempt. See VAT thresholds on GOV.UK.
If you are registered, the quote must make clear whether each price includes or excludes VAT. The rate depends on the type of work. Builders may be able to charge the reduced rate of 5% for some work if conditions are met. Installing energy saving products is one example. If you only supply those products and don't install them, you must charge the standard rate of 20%. Check VAT for builders and VAT Notice 708 on GOV.UK, or ask an accountant, before you put a rate on a quote. Our post on whether you have to register for VAT may also help.
How long the quote lasts, payment terms and deposit
Material prices change, and so does your diary. Give the quote an end date, such as 'valid for 30 days'. Then set out how and when you want to be paid. For bigger jobs that usually means a deposit and stage payments, with the balance due on completion. Say how much, when it falls due and how to pay.
I found no official limit on the size of a deposit, so set one that covers your up-front costs and that the customer will accept. Our guide to deposits and stage payments goes through the options. If the customer is a household rather than a business, they get extra protection under consumer law, and the rules on cancelling and refunds can matter for deposits. Check the current rules on GOV.UK before you write cancellation wording.
A simple building quote template
Here is the order that works for most jobs. Copy it into a document or an app and fill in the blanks.
Header: your name, contact details, quote reference and date
Customer: name and contact details
Site address: where the work is
Description of work: the stages, in plain words
Start date and time needed: with a note on what could change them
Price: labour and materials on separate lines
VAT: included or excluded, and the rate if you are registered
Exclusions: what is not covered
Valid until: the end date
Payment terms: deposit, stage payments, balance and how to pay
Acceptance: a line for the customer to confirm by reply or signature
Keep it to one or two pages. If you need more, the job probably needs a fuller contract.
Get the customer to say yes in writing
A quote only helps if the customer has read it. Go through it with them, especially the exclusions. Ask them to reply 'accepted' by email or message, or to sign it. Keep a copy. If the work changes later, get the extra work agreed in writing before you start it.
Where Quidjob fits
If you would rather not build this from scratch each time, Quidjob has a free building quote template. You fill in the job, labour, materials and terms from your phone and send the quote to the customer. When they accept, you can turn it into an invoice with a bank transfer link.
Wrap-up
A good building quote is specific. It names the site, splits labour from materials, lists what is left out, states the VAT position, sets an end date and sets out how you want to be paid. Say whether it is a fixed quote or an estimate. Then get a yes in writing before you start.