You turn up at the site gate with your tools and the van loaded. The site manager asks for your risk assessment, your method statement and proof of insurance. You have none of them to hand. That can mean a lost day, and sometimes a lost job.
No single official list says what every main contractor must ask a subcontractor for. Some of what they ask comes from the law. Much of it comes from their own policy or a pre-qualification questionnaire (a form they ask you to complete before they will use you). This post separates the two, so you know what to have ready.
Who is asking, and why
On a project with more than one contractor, the client appoints a principal contractor. This is the firm that controls the construction phase. The rules come from the Construction (Design and Management) Regulations 2015, usually shortened to CDM 2015. You are a 'contractor' under those rules, and so is every other firm or sole trader doing the work.
On a job for a household client, the principal contractor normally takes on the client's duties too. If the household client appoints no principal contractor, the contractor in control of the construction phase must do that role. So the person asking for your paperwork may be a main contractor, a builder running a house extension, or a site manager acting for them. HSE explains the principal contractor's role on its website.
HSE says the principal contractor must do several things that affect you:
write a construction phase plan before work starts, then review and update it
check that anyone they appoint has the skills, knowledge and experience to work safely, and where relevant the organisational capability too
make sure every worker gets a site-specific induction, plus any further information and training they need
stop unauthorised people getting onto the site
provide welfare facilities (toilets, washing and rest areas) from the start and keep them maintained
That is why they ask questions. They have to be able to show they checked you.
What the law puts on you as a subcontractor
Regulation 15 of the Construction (Design and Management) Regulations 2015 sets out the duties of a contractor. In plain terms:
Regulation 15(7): you must not appoint or employ anyone to work on a construction site unless they have, or are getting, the skills, knowledge, training and experience for the job.
Regulation 15(3): where more than one contractor is on the project, you must follow directions from the principal designer or principal contractor, and the parts of the construction phase plan that apply to your work.
Regulation 15(8) and (9): anyone you put to work must get appropriate supervision, instructions and information. That includes a suitable site induction, unless the principal contractor has already given one.
Regulation 15(10): you must not start work unless reasonable steps have been taken to stop unauthorised people getting onto the site.
Regulation 15(1): you must not carry out construction work unless you are satisfied the client knows their duties.
The information you give workers must also cover emergency procedures for serious and imminent danger, the risks found in the risk assessment, and risks from another contractor's work that you ought reasonably to know about. If you are the only contractor on a project, regulation 15(5) says you must make sure a construction phase plan is drawn up before the site is set up. HSE's page for contractors gives the same picture in plainer language.
What a main contractor commonly asks for
CDM 2015 does not name a document pack. It does not list method statements, skills cards or insurance certificates as legal requirements. These are the things main contractors commonly ask for, usually through their own policy. Rules vary, so ask each one what they want.
a risk assessment and method statement for your work (often called RAMS)
proof that you are trained and competent for the work, such as a construction skills card or trade qualifications
insurance details, such as public liability, and employers' liability if it applies to you
your registration details if the work needs it, for example Gas Safe Register for gas work
your CIS details, if they are a CIS contractor
emergency contact details and names of anyone working with you
Risk assessments and method statements
A risk assessment lists what could go wrong on the job and how you will stop it. A method statement sets out, step by step, how you will do the work safely. Many contractors want both, specific to the job, not a generic copy. A short, honest document that covers working at height, electrics, dust, manual handling or hot work, as relevant to your trade, will usually go down better than a long one copied from somewhere else.
If you have a standard set for your trade, adapt it for each site. Put in the address, the date and what is different about the place, such as other trades working alongside you.
Whether you need your own insurance or a particular level of cover is the contractor's call, so ask them. Insurance is a separate topic from the safety documents above.
The site induction
Every site worker must be given a site induction. HSE says it should be specific to the site and highlight particular risks, including those in Schedule 3 of CDM 2015, along with the control measures. Even occasional visitors need one, scaled to the visit. Escorted visitors only need to know the main hazards and controls. See HSE's page on site rules and induction.
Expect site rules to cover things like:
personal protective equipment (PPE)
radios and mobile phones
smoking
restricted areas
hot works and permit-to-work systems
traffic management and pedestrian routes
site tidiness and fire prevention
emergency arrangements
Turn up on time for the induction, listen, and ask where the welfare facilities and fire points are. If you bring someone to help you, they need an induction too. If the principal contractor has not given one, you must make sure your workers get a suitable one.
CIS checks if they are a CIS contractor
If the main contractor pays you under the Construction Industry Scheme (CIS), they must verify you with HMRC before they pay you. HMRC tells them whether you are registered for CIS and what rate of deduction to use. They must also re-verify you if you have not been on one of their CIS returns in the current or last 2 tax years.
To verify a sole trader, they need your UTR (Unique Taxpayer Reference, the 10-digit number HMRC gives you) and your National Insurance number. The details must exactly match what you registered with HMRC. Temporary National Insurance numbers, starting 'TN' or 2 digits, cannot be verified. HMRC explains how contractors verify subcontractors. Our guide, CIS explained for subcontractors, covers the rest.
A simple pre-start routine
Ask the main contractor, a few days before, what they need from you and by when.
Adapt your risk assessment and method statement for this site.
Gather your proof of training, insurance details and any registration numbers.
Check your UTR and National Insurance number match what HMRC holds.
Ask when the site induction is and who runs it.
Keep a copy of everything in your phone and a printed set in the van.
Wrap-up
Most gate-side hold-ups come from not knowing what a particular contractor expects. The law asks the contractor to check you are competent, gives you duties on inductions and information, and expects you to follow the site's plan. The rest depends on who you are working for. If you want your quotes, invoices and job details in one place on your phone, Quidjob can help you keep them to hand. This is general information, not legal advice. Check the HSE pages above, or ask a health and safety adviser, if your job is unusual.