Choose which optional cookies we may use. You can change this any time from “Cookie settings” at the foot of every page. Cookie policy

Running your business · 23 October 2026

Risk assessments for a one-person trade: what you actually need to write

Do you need a written risk assessment as a sole trader? The law and a main contractor may give different answers. Here is a short one-page format you can reuse on most jobs.

By Quidjob · Published · 6 min read

A clipboard with a one-page risk assessment form resting on a ladder at the edge of a scaffold platform.

A main contractor emails you before a start date: "Please send your RAMS." That stands for risk assessment and method statement. If you work alone, you may wonder whether you need one at all, and what a short version should look like.

This post covers what the law says about sole traders, why a client may still ask for paperwork, and a one-page format you can adapt for each job. It is general information, not legal advice. Your own situation may differ, so check the HSE pages linked below.

Does health and safety law apply to you as a one-man band?

The HSE (Health and Safety Executive, the body that regulates workplace safety in Great Britain) says that if you are self-employed, the law applies to you in any of these cases:

  • You employ anyone, even temporarily on a short-term contract.

  • Your work poses a potential risk to the health and safety of others. HSE's examples include harmful chemicals, noise, dust or fumes, and equipment that could injure someone.

  • You do work involving one of 6 high-risk activities: construction, agriculture, operating a railway, work with gas, asbestos, and genetically modified organisms.

The law does not apply to a self-employed person who employs nobody and whose work poses no risk to anyone else. For most trades that exemption will not help you. If you do construction work or work with gas, you are on the list of 6 activities. Read HSE's page on when health and safety law applies to the self-employed and its page on the high-risk activities to check your own work.

The duty to assess risk sits in regulation 3 of the Management of Health and Safety at Work Regulations 1999. HSE says employers and self-employed people must assess the risks to workers and to anyone else affected by their work, such as members of the public.

Does it have to be written down?

Not by law, if you work alone. HSE says the legal requirement to record significant findings applies if you have 5 or more people in your organisation. For fewer than five employees, HSE says you are not required to record anything, "but you may find it useful".

So when a main contractor asks for a written risk assessment from you, that is usually a client requirement, not the law. It is often a condition of getting onto site or being paid. It is still reasonable to supply one. Just don't tell a client "the law says I must" when it doesn't.

HSE also warns against relying purely on paperwork. The main priority is controlling the risks in practice. A tidy form is no use if the ladder is not tied or the supply is not isolated.

The five steps, in plain words

HSE sets out five steps to manage risk. They fit a one-person job well.

  1. Identify the hazards. Walk the site and look at the task. What could cause harm?

  2. Assess the risks. Who might be harmed, and how? Include customers, other trades and passers-by, not only yourself.

  3. Control the risks. Decide what you will do to remove the hazard or reduce the risk.

  4. Record your findings. HSE says a record should cover the hazards, who might be harmed and how, and what you are doing to control the risks.

  5. Review the controls. Check they work. Update the record after problems, accidents or near misses, and when circumstances change.

A one-page format a main contractor can read quickly

HSE's own examples of recorded findings are short. One reads: "Risk of dislodged load because of low branches – cut back regularly and put up a warning sign". That is one line with a hazard, a risk and a control. Aim for the same style.

Top of the page

  • Your name, business name and phone number.

  • Site address and the date you are starting.

  • A one-line description of the work, for example "Remove and replace bathroom suite, first floor".

  • Who else may be on site or in the property: the customer, children, other trades.

The table of hazards, written as lines

Use one line per hazard. Each line has three parts: the hazard, who could be harmed and how, and what you will do. Here are three illustrations. Replace them with what applies to your job.

  • Working at height on the first-floor landing – you or the customer could fall – use equipment suited to the task, keep the area below clear, and keep others away while you work.

  • Dust from cutting tiles – you and the household could breathe it in – cut outside where possible, use suitable dust control and protection, and keep doors to other rooms closed.

  • Tools and cables across the floor – anyone could trip – keep walkways clear and tidy up at breaks and at the end of each day.

Pick hazards that really apply. A page of ten generic lines copied from the internet is less convincing than four lines that fit the job. If your work involves gas, electrics, asbestos or structural changes, name those hazards and say how you will deal with them.

Bottom of the page

  • A line saying what you will do if something changes on site, for example "Stop work and reassess".

  • Your signature and the date.

  • A space for a review note, such as "Reviewed after discovering asbestos-type board behind the panel".

What about the method statement?

A method statement describes how you will do the work, step by step. HSE does not set one required format for a RAMS document. In practice the client often supplies a template, or asks for your own version. Do ask which they prefer before you write one.

There are cases where writing is expected. HSE's guidance says arrangements for demolition, dismantling or structural alteration must be recorded in writing before the work begins, usually as a method statement. HSE's guidance on assessing all work at height also discusses method statements. If a job involves either, treat the written plan as a must, not a nice-to-have.

If you take on construction work, the CDM 2015 rules (the Construction (Design and Management) Regulations 2015) may also give you duties. HSE's summary of duties under CDM 2015 and its contractors page are the places to check what applies to your type of job.

Keeping it useful

  • Write a fresh page for each new site or type of job. Reuse the layout, not the content.

  • Do it before you start, not once the client has chased you.

  • Take a copy with you and keep one with the job records. If something goes wrong later, a dated record shows what you planned.

  • Review it when anything changes. HSE says to review after problems, accidents or near misses.

If you use Quidjob, you can keep the quote and job notes together in one place, and store a copy of the assessment alongside them. Any filing method that you will actually use works just as well.

Wrapping up

If you work alone, the law does not make you write your risk assessment down. But you still have to assess risks if your work could harm others or falls under the high-risk activities, including construction and work with gas. A main contractor asking for it in writing is setting a client condition. A one-page record with hazards, who is at risk and your controls will usually meet it. For anything unusual in your own situation, check the HSE pages above or ask a health and safety adviser.

Official sources

Last checked 23 October 2026 against hse.gov.uk, legislation.gov.uk. General guidance for UK businesses, not legal, tax or financial advice. For your own situation, ask HMRC, an accountant or a solicitor.

Questions

Anything else? Email hello@quidjob.co.uk.

Do one-man-band tradesmen need a risk assessment?

HSE says health and safety law applies to a self-employed person whose work poses a risk to others, or who does work in one of 6 high-risk activities, which include construction and work with gas. The law does not apply only if you employ nobody and your work poses no risk to anyone else. Most tradespeople will not fall into that exemption.

Does a sole trader have to write the risk assessment down?

No. HSE says the legal requirement to record significant findings applies if you have 5 or more people in your organisation, and that with fewer than five employees you are not required to record anything. A client or main contractor may still insist on it as a condition of the contract.

Is there an official format for a RAMS document?

HSE's guidance does not set one format for a combined risk assessment and method statement. The client often supplies a template or asks for a particular layout, so ask them first. HSE does say that certain arrangements, such as demolition or structural alteration, should be recorded in writing before the work starts.

How often should I update a risk assessment?

HSE says to review it periodically and when circumstances change. Update it after problems, accidents or near misses, and note any changes in the record. In practice that means a fresh assessment for each new site or type of job.

Send the invoice. Get paid by bank.

Quotes, invoices and bank transfers for UK trades. 14 days free, no card needed.

Start free